Roads

  • Construction of walkways within the Clarendon Vale Green Belt from Mockridge Road to Marsden Street.
  • Construction of footpath and bus bay on Acton Road, Acton Park.
  • Road rehabilitation works on South Terrace, Lauderdale.
  • Kerb, gutter and footpath upgrades on Kerria Road to Lantana Road, Risdon Vale.
  • Gravel formation work on Dixon Point Road, Sandford.
  • Pothole repairs in Rosny, Bellerive and Howrah.
  • Intersection works on Chipmans Road, Rokeby.
  • Ongoing footpath replacement program.

Drainage

  • Drain construction on South Terrace, Lauderdale, associated with roadworks.
  • Investigation to improve stormwater quality along Howrah Beach.
  • Continuation of the Cambridge Oval stormwater collection project.
  • Stormwater upgrade on Hay Street, Seven Mile Beach.

Parks and reserves

  • Irrigation upgrade continues at Bellerive Beach Park.
  • Irrigation upgrade continues at Tanundal Park, Howrah.
  • Construction of Warrane Community Garden and toilet at 18 Heemskirk Street, Warrane continues.
  • Track construction from Pindos Park to Gully Track, Tranmere.
  • Track construction from Flagstaff Hill to Caves Hill on the Meehan Ranges.
  • Ongoing Meehan Range mountain bike track construction, toilet and shelter works.
  • Tree replacement program in Clarendon Vale.
  • Construction of a ball catching fence at Wentworth Park sportsground.
  • Construction of track entrances into Rokeby Hill’s bushland reserve.

Fire Management

  • Continuation of inspection, preparation and burning of natural areas as per the various natural area management plans, as the conditions allow.

Council Facilities

  • Accessibility compliance works at Warrane Sports Centre.
  • Installation of grease traps at council facilities that prepare food onsite.
  • War memorial maintenance at ANZAC Park, Lindisfarne.